Recent Construction Projects

Showing articles 21 - 28 (28 total)

Shaker Pond Commons

Posted on 03/05/2010 at 12:12 pmViewed 6,051 times

During tough economic times the value of hard work and attention to detail often make the biggest difference in the success or failure of a project.  This project became a reality in part, because of the value our engineering recommedations offered.  By modifying the site projection elevation, we reduced the amount of fill required, which in...

Ocean Avenue School

Posted on 03/05/2010 at 12:11 pmViewed 5,286 times

Start Right. End Right. This project is an example of how we gained the general contractor, Ledgewood Construction multiples of time. We take pride in getting our part of the project done on, or before the schedule. We demolished the old school and recycled the steel and old concrete back at our facility in Buxton. This site offered many...

Madison and Greenleaf CSO

Posted on 03/05/2010 at 12:09 pmViewed 4,644 times

Gorham Sand & Gravel has lots of experience with Combined Sewer Overflow projects. Cumberland County communities want to keep Casco Bay clean by separating existing sewer and stormwater mains. The Madison and Greenleaf CSO project for the City of Portland is an example of how we replaced the mains, reconstructed the street and upgraded the...

Moody's Collision Center

Posted on 02/18/2010 at 06:14 pmViewed 5,040 times

Located on Presumpscot Street in Portland. This project consisted of reclaiming a former concrete spoil dump site by first extracting all of the concrete disposed of on the site. Crushing it with our mobile crusher to turn it into structural fill, placing and compacting the material to prepare the site for the development of the newest addition...

USM Commons

Posted on 02/18/2010 at 06:13 pmViewed 4,448 times

Located on Bedford Street in Portland. This 3+ million dollar project included the green construction practices and solutions, environmental site remediation, and porous walks which allow rain to drain through them rather than increase site run-off. The finishing touches were completed in August 2009

Torrey Street Sewer Separation and Street Reconstruction

Posted on 02/18/2010 at 06:13 pmViewed 4,011 times

Located just off Ocean Avenue in Portland . This nearly three million dollar project consisted of installing new sewer and drainage systems. To make way for this project, existing water and gas mains needed to be relocated. The street sidewalk and curbing were reconstructed in the process. Finish paving was completed in July 2009. 

Portland Jetport Parking Garage

Posted on 02/18/2010 at 06:05 pmViewed 4,124 times

Located at the Portland Jetport. This project consisted of approximately demolition of an existing inadequate parking garage and the construction of a new state of the art parking facility including all the security measures required for today’s traveling public. Job completed May 2009.

Park North

Posted on 02/18/2010 at 06:04 pmViewed 3,045 times

A new commercial retail, office and residential development located on Route One in Saco, Maine. Park North Development LLC is the owner and developer of this new mixed use project. Currently, the plans for the immediate area included an adjacent 14 lot business park with lot sizes ranging from 1.5 acres to 6.5 acres. In addition, the developer...

   1 | 2 | 3
 
Copyright © 2017 Gorham Sand & Gravel, Inc. All Rights Reserved. Home | Contact Us | Site Map
Powered By: Site Avenger | Site Production: Saco Design

We're Hiring.  Apply online now.  Click here >